GreenEconomy.MediaSouth Africa's green economy intelligence hub
AnalysisIntelligenceTourism & Leisure

Gautrain case study: Construction management during the development of the Gautrain rapid rail system

By steven · 2 March 2021 · 1 min read · 0 views

Gautrain case study: Construction management during the development of the Gautrain rapid rail system

The novelty and scale of the Gautrain project created many challenges that had to be overcome.

The construction phase of the Gautrain project was divided into four main sections namely: Tunnel Link Park Station via Sandton to Marlboro Portal (15 km), Airport Link from Marlboro Portal to OR Tambo International Airport (ORTIA), (19 km) Midrand Link from the turnout on the ORTIA link at Marlboro to Nelmapius Overpass (20.6 km) and Hatfield Link from Nelmapius, Overpass to Hatfield via Pretoria Station (18 km). Here’s the link to the Gautrain Management Agency case study on Gautrain Rapid Rail Link System Construction

http://gma.gautrain.co.za/Style%20Library/Branding/Doc/GMA%20Case%20Study_Construction%20Management_S_2017.pdf

Follow Gautrain on:

Tagscase studyConstruction managementGautrainGautrain rapid rail systemrapid rail systemBuildingEnvironmentmanufacturingMaterials & Technologies
Share

steven

Writing for GreenEconomy.Media

URL preservedThis post keeps its original address /gautrain-case-study-construction-management-during-the-development-of-the-gautrain-rapid-rail-system/, nothing is re-slugged, so no search ranking is lost in the migration.

Show SEO & AI-citation metadata for this article

DemoEvery article carries this structured metadata so it surfaces in search and can be cited by AI answer engines. In the back end, a person posting fills these in, or the AI layer drafts them.

Meta titleGautrain case study: Construction management during the development of the Gautrain rapid rail system | GreenEconomy.Media
Meta descriptionThe novelty and scale of the Gautrain project created many challenges that had to be overcome. The construction phase of the Gautrain project was divided i
Meta keywordsNot set
URL slug/article/gautrain-case-study-construction-management-during-the-development-of-the-gautrain-rapid-rail-system
Schema.org typeNewsArticle (JSON-LD embedded)